VEXcode VR allows you to code a virtual robot using a block based coding environment.

VEXcode VR provides substantial resources to support teaching Computer Science (CS).


Getting Started


Tutorials on VEXcode VR Features


Using Activities

VEXcode VR block-based coding workspace for controlling a virtual robot

VEXcode VR provides a library of activities that can easily be implemented within a lesson or as a stand alone activity. For more information on how to use VEXCode VR Activities, view the following articles.


Sharing Projects

VEXcode VR workspace showing block-based code and the virtual robot playground

Once a project is created or edited, it can then be shared. Sharing projects is helpful when submitting assignments or sharing examples with a group of students. See the following articles on how to Save, Share, and Load VEXcode VR projects:


Teacher Portal

VEXcode VR workspace showing block-based code for a virtual robot

The Teacher Portal contains resources to provide educators with the tools they need to teach with VEXcode VR. View the following article for detailed information on the VEXcode VR Teacher Portal.

For more information, help, and tips, check out the many resources at VEX Professional Development Plus